Free
Economic Zone
"Grodnoinvest"

Untitled Document
Наименование/Характеристика
Фотографии

Open joint-stock company «Grodno Building Materials Plant» has got 2 unused production premises (workshop #4, #6). The premises suitable for organization of different kinds of production are situated in the territory of the company as well as in the territory of the free economic zone «Grodnoinvest».

The premises description

Workshop #4:
Total area – 7380 m2;
Foundation – concrete brick;
Exterior and interior panel – 250 mm concrete panel;
Floor structure – arched concrete slab;
Roof – roll ruberoid;
Floor – concrete panel;
There are: central heating, sewerage system, combined extract and input ventilation, telephone connection;
Depreciated value as of 1.11.1008 – 3381,2 million Belarusian rubles.

Workshop #6:
Total area – 11640 m2, including railway loading site with the area of 1152 m2;
Foundation – concrete brick;
Exterior and interior panel – 250 mm concrete panel;
Floor structure – arched concrete slab;
Roof – roll ruberoid;
Floor – no finished floor;
There are no central heating, sewerage system, lighting;
Depreciated value as of 1.11.1008 – 2784,0 million Belarusian rubles.

The premises can be sold, rented, or used for a joint production organization.
Contact information: Grodno, Dzerzhinskogo street, 100, Open joint-stock company «Grodno Building Materials Plant», tel.: +375 152 435 553, +375 292 664 020, e-mail: econ@ksm.grodno.by

KSM1 KSM2

KSM3

“Gronitex” JSC, 91 Gorkogo str.
Central repair workshops - 3-storeyed building,
1974 YrBlt,
total area - 4256.2 m2,
foundation - concrete,
roof – roll ruberoid,
outer walls – brick, reinforced concrete panels,
flooring – tile, concrete, earthenware tile, plank, parquet,
ceiling height– 2,95 m.

There are: access ways, power supply, sewage system, cold and hot water supply, balanced system of ventilation.

CRM1 CRM2

CRM3

“BelTAPAZ”  97 Gorkogo str.
 Separate office premise – 7-storeyed building,
1982 YrBlt,
total area – 2 683,1 m2,
ceiling height – 3m,
walls – concrete panels,
heat fusing membrane roofing,
flooring – linoleum.

There are: power supply, sewage system, cold and hot water supply.

BELTOP1 BELTOP2

Main production building with administration building (2-storeyed)
1980 YrBlt,
total area – 9 375,9 m2,
unused area–  8659,9 m2,
walls – brick, reinforced concrete panels,
roof material – combined membrane,
floor – concrete, tile, plate, linoleum,
ceiling height - 5,39 m.

There are: power supply, sewage system, cold water supply. The building requires capital repairs.

GLPKU

Workshop #1 –3-storeyed building,
1985 YrBlt,
total area – 5655 m2,
unused area –  5655 m2,
walls–concrete panels,
roof – roll ruberoid,
tile floor,
ceiling height – 4,42m.
There are: power supply, sewage system, cold water supply. The building requires capital repairs.

 

Administrative building, attached to the workshop #1 – 5-storeyed building
1976 YrBlt,
total area –1786,1 m2,
unused area –  1786 m2
walls– reinforced concrete panels,
roof –roll ruberoid,
flooring – linoleum, parquet,
ceiling height – 3 m

There are: power supply, sewage system, cold water supply. The building requires capital repairs.

VSPKORU

Scientific-production association «Politechnik» ltd, 31/2 Pobedy str. Production premises 1966 YrBlt,
total area – 800 m2,
concrete foundation,
roof material – combined membrane,
exterior walls  – brick, concrete,
floors - concrete,
ceiling height – 4,1m; 5,1m.

There are: access ways, power supply, sewage system, cold and hot water supply.

POLITEH1 POLITEH2

Republican unitary enterprise “Plant “Optic”
Lida, 10 Masherova str.
Total area – 3485 m2,
Basement area – 310 m2, building area – 1836 m2,
total structural volume – 13814 m3. 1975 YrBlt.
foundation – ferroconcrete blocks.
Outer walls, inner walls – reinforced concrete panels.
Partition walls – reinforced concrete panels, bricks.
Floor – reinforced concrete slab.
Roof material – combined roll roofing.

There are: cold and hot water supply, sewage system, central heating, power supply, radio and telephone.
OPTIK

Unitary enterprise “Lida meat processing plant”, Lida, 16 Tolstogo str.
The object of incomplete construction
The construction started in 1988.
Total area – 39387 m2.

There are: water supply, power supply, telecommunication, and automobile and railway transport access ways.
LIDM1LIDM2

Unitary enterprise “Lida meat processing plant”, Lida, 16 Tolstogo str.
Separate warehouse building (one-storeyed)

Total area 900 m2.
SKLADAR
©Administration of FEZ "Grodnoinvest"

tel./fax: +375.152.43-01-75; +375.152.41-86-87
e-mail: